Kassenjje Church of Uganda Primary School
Serving 722 students in Uganda’s Kasengejje community as a government-aided day school for primary and nursery students, Kassenjje Church of Uganda Primary School currently relies on water from a borehole well but continually finds its needs unmet.
The borehole is shared with a church and multiple households, meaning students often miss class due to the 70-minute round trip. While fetching, students have to traverse a steep slope, cross a busy road, and face the possibility of mugging or even sexual assault.
PROJECT PROPOSAL:
The Ugandan Water Project, our implementing partner, will erect a 10,000-liter polyethylene tank on a base made of brick, hardcore, and cement. Once cured, our crew will then place the tank on the base and create an overflow hole in the top of the structure, attaching a pipe to it that extends six inches beyond the perimeter of the base. Crew members will also attach face boards to the roof of the building adjacent to the tank to create a suitable surface to which they can attach the gutters that will allow water to flow from the metal roof to the tank. Just before the outlet pipe reaches the tank, a “T” joint will be inserted to create a first flush, a rudimentary filtration system that reduces the amount of debris and contaminants that enter the tank. The crew will then construct a protective wall around the tank and first flush, as well as a tap stand located slightly downhill of the tank. The rainwater collection system will be paired with four Sawyer Point One water filters in order to ensure that all water collected from the tank will be safe for drinking.
The Ugandan Water Project, our implementing partner, will erect a 10,000-liter polyethylene tank on a base made of brick, hardcore, and cement. Once cured, our crew will then place the tank on the base and create an overflow hole in the top of the structure, attaching a pipe to it that extends six inches beyond the perimeter of the base. Crew members will also attach face boards to the roof of the building adjacent to the tank to create a suitable surface to which they can attach the gutters that will allow water to flow from the metal roof to the tank. Just before the outlet pipe reaches the tank, a “T” joint will be inserted to create a first flush, a rudimentary filtration system that reduces the amount of debris and contaminants that enter the tank. The crew will then construct a protective wall around the tank and first flush, as well as a tap stand located slightly downhill of the tank. The rainwater collection system will be paired with four Sawyer Point One water filters in order to ensure that all water collected from the tank will be safe for drinking.
H2O for Life is not a WASH (water, sanitation and hygiene) project implementer. We have partnerships with non-governmental organizations (NGOs) implementing WASH in Schools projects around the world. Our NGO partners match funds needed for each school project. We also have a generous donor that provides us with an interest-free loan that, along with matching funds, allows for many projects to be started or possibly even completed before total funds have been raised. In rare situations we reserve the right to reallocate funds to alternate project(s).